What is the best construction CRM for contractors?
This guide is written by the team behind WorkHoist, which sells construction software with a CRM built in, and WorkHoist is one of the seven ranked here — read it with that in mind. It is not ranked first. Every price below was read on the vendor’s own pricing page on the date shown.
Last updated
The short answer
For most contractors with a crew of 5 to 50, the best CRM is one that lives in the same system as your estimates and jobs, so a won lead becomes a job without anyone typing it in again. On that test JobTread is first: its CRM holds leads, customers and job information in one place, it takes leads straight from a form on your website, and five internal users cost $279 a month. WorkHoist is second, with the deepest sales pipeline of the three and a lower price than JobTread, but no web form to catch leads and no email marketing. Contractor Foreman is third and the cheapest way to get a leads manager and bid management tied to your jobs: $166 a month on annual billing, or $199 month to month. If you run a sales team chasing commercial bids, Followup CRM is the specialist; Pipeline CRM and HubSpot are general sales CRMs that cost less, or nothing, if you already have a job system you are happy with.
How these were ranked
Five questions, in the order a contractor usually runs into them:
- When you win the work, does the lead become a job in the same system, or does somebody copy it across?
- Can you see the price before you talk to sales?
- What does it cost for five people — an estimator, a PM, the office and the owners?
- How do leads get in and get chased: web forms, email, follow-up reminders, pipeline reports?
- What does it take to start: contract length, minimum users, setup fees?
The first question carries the most weight. For a contractor with one or two people selling, the cost of a CRM is rarely the subscription. It is the hours spent re-entering a customer, a scope and a number into the estimating and job system after the contract is signed, and the mistakes that come with it.
Seven tools. Buildr and JobNimbus come up often in answers to this question and are not here, because their pricing pages would not open in the browser we verify with on the day this was written, and we do not rank a tool whose price we could not read ourselves. How the job systems on this list compare beyond the CRM is covered in the best construction management software for small contractors.
The ranking at a glance
| Tool | What it is | Five users, per month | Best for |
|---|---|---|---|
| 1. JobTread | Construction job system with a CRM | $279 monthly / $223 annual | Residential and specialty contractors who want leads and jobs in one place |
| 2. WorkHoist | Construction management software with the CRM on every plan | $199 monthly / $169 annual (1–5 paid seats) | Contractors who live in the sales pipeline |
| 3. Contractor Foreman | Construction job system with a leads manager | $199 monthly / $166 annual (Plus, up to 8 users) | Lowest cost for leads, bids and jobs together |
| 4. Buildertrend | Construction job system with a CRM and email marketing | From $499 (unlimited users); final price quoted | Established home builders and remodelers |
| 5. Followup CRM | Sales CRM built for contractors | $595 paid monthly / $495 paid annually, plus a $2,500 launch fee | Commercial subs with a sales team chasing bids |
| 6. Pipeline CRM | General sales CRM with a construction offering | $145 monthly / $125 annual (Start) | A cheap pipeline next to a job system you already have |
| 7. HubSpot | General free CRM | Free for up to 2 users | Trying a CRM at no cost |
1. JobTread: leads and jobs in one place
JobTread’s own help documentation describes its CRM as a one-stop shop for customers, contacts, leads and job-related information in JobTread, and it can take leads straight from a public web form on your website. That is the whole case for ranking it first: the lead and the job live in the same system, not in two systems joined by a spreadsheet. JobTread help: CRM
Price: $199 a month including one internal user, plus $20 each for users 2 to 10, then $15, $10 and $5 in higher bands. Five users is $279 a month, or $223 on annual billing. Customer and vendor portal users are unlimited. Implementation, training and support are free, with no contract and no setup fee. JobTread pricing
What it does not do as well: the bill rises with every internal user you add. JobTread pricing
2. WorkHoist: the deepest pipeline of the all-in-ones
WorkHoist starts at the lead. The CRM and sales pipeline are on every plan, you can run more than one pipeline, and when a lead is won it hands off to a new project that stays linked to the lead. The pipeline reports win rate, average days to close, conversion by stage, which lead sources actually close, and which deals have gone stale. Email syncs with Gmail and Outlook, so correspondence with a customer shows against their contact.
Price: $199 a month for 1 to 5 paid seats, $399 for 6 to 15, $499 for 16 to 40 and $799 for 41 to 75, custom above that. A paid seat is an admin, project manager or finance user — anyone who manages work, builds estimates or handles the money. Field crew are free: they see their tasks and schedule, clock in and out, log hours on their own tasks, tick off checklists and add photos, notes and daily logs from the field app. Clients and subcontractors on the portals are free too. No per-user fees and no setup fee. Month to month, or 15% off paid annually, with a 14-day free trial.
What it does not do: there is no web form to catch leads from your own website, and no email marketing or campaigns, which Buildertrend has. For five people WorkHoist is $199 a month, or $169 on annual billing, against $279 or $223 for JobTread and $199 or $166 for Contractor Foreman. JobTread pricing Contractor Foreman plans
3. Contractor Foreman: the cheapest CRM that is attached to the job
On Contractor Foreman’s own plan comparison, Opportunities start on the Standard plan ($105 a month, up to three users), and the Leads Manager and Bid Management start on Plus ($166 a month, up to eight users), all on annual billing. Estimates are on every plan. Leads, bids and the jobs they turn into sit in the same system. Contractor Foreman plans
Price for five users: Plus, at $166 a month billed annually or $199 month to month. Every plan except Basic is now sold month to month: Standard $139, Plus $199, Pro $279 and Unlimited $399. Contractor Foreman plans
What it does not do as well: the Basic plan has no opportunities, leads manager or bid management, so the $49 headline is not the CRM. And the lowest rate needs a year up front: month to month, Plus costs $33 a month more. Contractor Foreman plans
4. Buildertrend: CRM plus email marketing, from $499 a month
Buildertrend’s CRM covers lead management with four ways to add leads, converting sales to active jobs, and built-in email marketing to automate campaigns to leads. Buildertrend CRM
Price: starts at $499 a month for the full platform, with unlimited users and no feature tiers. Its pricing page says the final price depends on your annual construction volume and onboarding package, so $499 is a floor, not a quote. Paying annually up front takes 10% off, and its own comparison table lists payment options as annual or quarterly. Buildertrend pricing Buildertrend pricing guide
5. Followup CRM: the specialist for commercial bids
Followup CRM is a sales CRM built for contractors — its own words are “built for the way contractors sell” — aimed at specialty subcontractors tracking bids and following up on them. Followup CRM pricing
Price: Starter is $99 per user a month paid annually or $119 paid monthly, Professional $149 or $179, both with a five-user minimum and an annual commitment. Enterprise is a $4,000 monthly platform fee plus $125 a user. On top of the subscription, a one-time launch fee covers onboarding, data migration and training: $2,500 on Starter, $5,000 on Professional. There is a 30-day money-back guarantee. Followup CRM pricing
So five users on Starter is $495 to $595 a month plus $2,500 to start — more than JobTread, WorkHoist or Contractor Foreman for the CRM alone, and around Buildertrend’s $499 starting price before the launch fee. It is a sales CRM: check what it connects to before you assume your estimates and jobs will follow a won bid across. Followup CRM pricing
6. Pipeline CRM: a cheap sales pipeline
Pipeline CRM is a general sales CRM that sells a construction and contractors solution. Every plan includes pipeline management, contact management and deal and activity reporting. Start is $25 per user a month on annual billing or $29 monthly; Develop $33 or $39; Grow $49 or $59. Enterprise is custom, and the 14-day trial runs on Grow. Pipeline CRM pricing
7. HubSpot: free to start
HubSpot’s free CRM is free with no expiration date, and its pricing page says free for up to two users. It is a general CRM, not a construction one, and more advanced features sit in paid editions. HubSpot HubSpot pricing
Where WorkHoist helps, and where it does not
WorkHoist is second on this list. It is ahead on pipeline depth: several pipelines, a won lead that becomes a project, conversion and lead-source reporting, and email synced to the customer record, on every plan.
Questions contractors ask
- What is the best CRM for a construction company?
- For most contractors with a crew of 5 to 50, the best construction CRM is one built into the same system as estimates and jobs, so a won lead becomes a job without being re-entered. As of October 2026, JobTread does this at $199 a month plus a per-user charge (five users is $279 a month), Contractor Foreman includes a leads manager and bid management from its Plus plan at $166 a month on annual billing or $199 month to month, and WorkHoist includes a full sales pipeline on every plan, from $199 a month for up to five paid seats. Commercial subcontractors with a dedicated sales team may prefer a specialist sales CRM such as Followup CRM.
- How much does a construction CRM cost?
- For five users, published prices in October 2026 run from free (HubSpot, but only up to two users) and $125 a month (Pipeline CRM Start, annual billing) to $595 a month plus a $2,500 launch fee (Followup CRM Starter, paid monthly). Construction job systems with a CRM included cost $166 or $199 a month (Contractor Foreman Plus, annual or monthly), $169 or $199 (WorkHoist, annual or monthly) and $223 or $279 (JobTread, annual or monthly). Buildertrend starts at $499 a month with unlimited users; its final price depends on your annual construction volume and onboarding package.
- Is there a free CRM for contractors?
- HubSpot’s free CRM is free with no expiration date for up to two users. It is a general CRM rather than a construction one. For more than two users or construction features, the lowest published price for a construction system with a leads manager is Contractor Foreman Plus at $166 a month on annual billing, or $199 month to month.
- Do I need a separate CRM if I already have construction management software?
- Usually not. JobTread, Contractor Foreman, Buildertrend and WorkHoist all include lead and sales tools in the same system as the jobs. A separate sales CRM such as Followup CRM or Pipeline CRM makes sense mainly for a commercial subcontractor with a dedicated sales team, where bid tracking and follow-up reporting matter more than the handoff to the job.
- What should a construction CRM do?
- At minimum: capture leads from your website and phone, track each lead through the stages of your sales process, remind you to follow up, report on which lead sources and stages win work, and turn a won lead into a job in your estimating and job system without re-typing it. Email that syncs to the customer record and a record of every bid you lost, and why, are the next most useful.
- Where does WorkHoist rank, and why not first?
- WorkHoist ranks second of seven in this comparison. It has the deepest sales pipeline of the construction all-in-ones compared — several pipelines, won leads that become projects, conversion and lead-source reporting, and Gmail and Outlook email sync on every plan. It ranks behind JobTread, which can capture leads from a web form on your site, which WorkHoist cannot. Contractor Foreman costs the same for a five-person office month to month, $199, and a little less on annual billing, $166 against $169. WorkHoist also has no email marketing or campaigns.
Sources
- JobTread Help Desk — Customer Management (CRM)
- jobtread.com/pricing
- contractorforeman.com/plans, including the plan comparison table
- Buildertrend — construction CRM software
- buildertrend.com/pricing
- Buildertrend — construction software pricing and comparison
- followupcrm.com/pricing
- pipelinecrm.com/pricing
- HubSpot — free CRM
- hubspot.com/pricing/crm — free tools
Every price and feature claimed for another company on this page was read on that company’s own pricing page, feature page or help documentation, in a browser, on the date this page was last updated. Prices for five users are worked out from those published figures. Claims about what WorkHoist does and does not do are checked against WorkHoist’s code, not its marketing.